Challenges in Construction of Sharavathi Backwater Extra-Dosed Bridge
Er. Rakesh Kumar Chowbey - General Manager (Structrures) Dilip Buildcon LimitedCase Study
Construction of Extra -Dosed major Bridge across Sharavathi back waters and approaches between Ambargodu and Kalasavalli of NH-369E in the state of Karnataka.
Date of Commencement : 12-12-2019
Date of Completion : 22-11-2024
Project Cost : 370.87
Salient features:
Total length of Bridge : 2125 M
Clear carriage way : 11.00 M
Width of footpath : 1.5M on both side
Over all Deck width : 16.00M
Published on:
Published in: NBM&CW - March 2025